SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 13.07.10 is 39019.963 MU
Year 2010-2011 

DAILY GENERATION  REPORT FOR 13.07.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

35.149

37.038

37.597

37.279

456.937

478.966

482.602

478.599

2690.555

2883.936

2907.174

2883.062

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Unit - 1 

6.265

6.197

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 2 

6.282

6.241

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 3 

6.189

6.134

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 4 

6.314

6.279

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 5 

6.284

6.212

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 6 

6.263

6.216

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

 

Total

37.597

37.279

144:00

0:00:00

0:00:00

0:00

0:00

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

781

Max. Dam Level

1495.70

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

392

Min. Dam Level

1493.85

Wangtoo

1382

12:00

1110

22:00

Water Spillage

308

Max. TRT Level

1009.5

SFT

Water utilised for SFT flushing

81

Min. TRT Level

1009.0

Draft Tube

884

1:00

525

24:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

0

0

Draft Tube

15

5