SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 08.07.10 is 38833.623 MU
Year 2010-2011 

DAILY GENERATION  REPORT FOR 08.07.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

35.149

36.750

37.174

36.830

281.192

295.012

296.262

293.788

2514.810

2699.982

2720.834

2698.251

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Unit - 1 

6.295

6.227

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 2 

6.228

6.176

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 3 

6.065

6.000

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 4 

6.268

6.225

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 5 

6.152

6.080

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 6 

6.166

6.122

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

 

Total

37.174

36.830

144:00

0:00:00

0:00:00

0:00

0:00

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

831

Max. Dam Level

1495.20

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

387

Min. Dam Level

1492.80

Wangtoo

2294

4:00

1310

13:00

Water Spillage

363

Max. TRT Level

1010.0

SFT

1493

9:00

1493

9:00

Water utilised for SFT flushing

81

Min. TRT Level

1010.0

Draft Tube

1486

2:00

712

24:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

0

0

Draft Tube

25

8