SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 07.07.10 is 38796.449 MU
Year 2010-2011 

DAILY GENERATION  REPORT FOR 07.07.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

35.149

36.841

37.138

36.821

246.043

258.262

259.088

256.958

2479.661

2663.232

2683.660

2661.421

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Unit - 1 

6.299

6.236

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 2 

6.241

6.193

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 3 

5.990

5.930

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 4 

6.270

6.232

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 5 

6.094

6.027

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 6 

6.244

6.203

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

 

Total

37.138

36.821

144:00

0:00:00

0:00:00

0:00

0:00

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

1004

Max. Dam Level

1495.70

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

387

Min. Dam Level

1492.95

Wangtoo

4307

1:00

1669

19:00

Water Spillage

-

Max. TRT Level

1011.0

SFT

857

9:00

857

9:00

Water utilised for SFT flushing

-

Min. TRT Level

1010.5

Draft Tube

2490

1:00

1135

20:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

0

0

Draft Tube

37

13