A 15.088 km long, 10.50 m dia circular
concrete lined Head Race Tunnel. ( The
Intake structure has already been constructed at the outfall of Rail Race
Tunnel from Power House of NJHEP at Jhakri).
-
A 155.75 m high, 38 m dia,
restricted orifice type, open to sky Surge Shaft.
-
A Butterfly Valve House – 69 m long, 10.50 m wide and 23 m high,
housing three Butterfly Valves each of 5.4 m dia.
-
3 Nos circular steel lined partly underground Penstocks
of lengths 440 m middle penstock, 472 m right penstock
and 454 m left penstock each Penstock bifurcating into two
branch tunnels of 3.80 m dia each to feed Six Generating Units.
-
A surface type Power House of size
158 m (L) x 34.50 m (W) x 48 m (H) to house
6 vertical axis francis turbines generating units of
68.67 mw each, to utilize a net head of 119.10 m and design
discharge of 383.88 cumecs.
-
A 67.94 m long, 10.50 m dia standard horse shoe type, concrete lined,
Tail Race Tunnel with open channel.
-
Energy generation of 1770 Gwh
during a 90 % dependable year, with 95 %
machine availability.
-
The power generated from the project would be evacuated by LILO of
400 KV Jhakri – Nalagarh D/C line at village Duttnagar near Rampur
Bushahr.
|
1. Location
|
|
State
|
:
|
Himachal Pradesh
|
District
|
:
|
Shimla/Kullu
|
|
River
|
:
|
Satluj
|
|
Village
|
:
|
Near Village Bael
|
|
2. Hydrology
|
Catchment Area at Nathpa
|
:
|
49820km˛
|
|
Catchment Area at Rampur (G&D Side)
|
:
|
50880 km˛
|
|
Average Annual run off in 50% Average year
|
:
|
10181.22 Mm3
|
|
3. Intake Structure
|
|
Normal Pond Level
|
:
|
1005m
|
|
Minimum Pond level
|
:
|
1002m
|
|
Number of Intake Gates
|
:
|
2(6m wide x 7m high)
|
|
4. Intake Tunnel
|
|
Type
|
:
|
Circular, concrete lined
|
|
Size
|
:
|
10.15m/10.50m dia
|
|
Length
|
:
|
484m
|
|
5. Intake Conduit/(cut & cover)
|
|
Type
|
:
|
Circular, concrete lined
|
|
Length
|
:
|
43.2m
|
|
6. Head Race Tunnel
|
|
Type
|
:
|
Circular, Concrete Lined
|
|
Size
|
:
|
10.50m finished diameter
|
|
Length
|
:
|
15.088 km
|
|
Velocity
|
:
|
4.43m/sec
|
|
7. Adits
|
|
Nos.
|
:
|
5
|
|
Size
|
:
|
Dia of each 7.5m,
|
|
Lengths
|
:
|
Left Bank adit 328m, Kajo adit 795m, Kunni adit 604m, Goshai adit 1090m and
Bayal adit 483m
|
|
8. Surge Shaft
|
|
Type
|
:
|
Restricted Orifice type Open to sky
|
|
Height
|
:
|
155.75m
|
|
Diameter
|
:
|
38m
|
|
9. Penstocks
|
|
Numbers
|
:
|
Three number bifurcating X6
|
|
Size
|
:
|
5.40/3.80m circular, steel lined
|
|
Type
|
:
|
Partly
Underground
|
|
Length
|
:
|
Middle 440m, Right 472m and left 454m
|
|
10. Butterfly Valve House
|
|
Nos., Size of Valve
|
:
|
3 Nos. , 5.4m internal dia
|
| |
|
11. Salient Features of Gates |
|
a. Surge Shaft Gates
|
|
Size of the gate |
:
|
4.4m x 6.6m |
|
Size of the gate shaft
|
:
|
5.4m x 1.15m |
|
Nos.
|
:
|
3 Nos. |
|
Type of Hoist
|
:
|
Rope Drum Hoist |
|
Sealing
|
:
|
u/s skinplate and d/s sealing |
|
Operation |
:
|
Raising under balance water head condition and
lowering under differential water head of 5m. |
|
Purpose of Gate |
:
|
To facilitate repair and maintenance of d/s valves
and pressure shafts/penstocks |
|
b. Draft Tube Gates
|
|
Size of the gate |
:
|
7.81m x 3.591m |
|
Nos.
|
:
|
6 Nos. |
|
Type of Hoist
|
:
|
Rope Drum Hoist |
|
Sealing
|
:
|
d/s skinplate and d/s sealing |
|
Operation |
:
|
Raising under balance water head condition and
lowering under unbalanced water head conditions. |
|
Purpose of Gate |
:
|
To facilitate repair and maintenance of generating
units and Draft Tubes by isolating respective Draft Tubes from
tailrace tunnel waters. |
|
c. TRT Gates
|
|
Size of the gate |
:
|
7.5m x 4.33m |
|
Nos.
|
:
|
3 Nos. |
|
Type of Hoist
|
:
|
Rope Drum Hoist |
|
Sealing
|
:
|
u/s skinplate and u/s sealing |
|
Operation |
:
|
Raising and lowering under unbalanced water head
conditions. |
|
Purpose of Gate |
:
|
To isolate the flow from river side into the
Tailrace Tunnel during high flood. |
|
d. ADIT Gate at Goshai
|
|
Size of the gate |
:
|
2.5m x 2.5m |
|
Nos.
|
:
|
1 No. |
|
Type of Gate |
:
|
Hinged Type (hoist not required) |
|
Sealing
|
:
|
u/s skinplate and d/s sealing |
|
Purpose of Gate |
:
|
To facilitate future inspection , repair and
maintenance of Rampur Headrace Tunnel. |
|
e. Spill Tunnel Gate
|
|
Size of the gate |
:
|
10.15m x 10.15m |
|
Nos.
|
:
|
1 No. |
|
Type of Hoist
|
:
|
Rope Drum Hoist |
|
Sealing
|
:
|
u/s skinplate and u/s sealing |
|
Purpose of Gate |
:
|
To isolate the flow from river side into the Spill
Tunnel during high flood. |
|
12. Powerhouse Complex
|
|
Type
|
:
|
Surface
|
|
Installed Capacity
|
:
|
412 MW
|
|
Size
|
:
|
158m L x 34.5m W
x 48m High
|
|
Nos. of Units
|
:
|
6
|
|
Type of turbines
|
:
|
Francis,
vertical axis
|
|
Speed of turbines
|
:
|
214.3 RPM
|
|
Generators
|
:
|
6x68.67 MW, 0.9 pf, 11 Kv
|
|
Gross head
|
:
|
138.7m
|
|
Net head
|
:
|
119.10m
|
|
Design Discharge
|
:
|
383.88 cumecs
|
|
13. Tail Race Tunnel/Channel
|
|
Type
|
:
|
Horse Shoe Concrete lined /
Trapezoidal
|
|
Size
|
:
|
10.5m dia
|
|
Length
|
:
|
67.945m
|
Max.TWL
|
:
|
866.70m
|
Min.TWL
|
:
|
862.90m
|
|
14. Outfall Arrangement
|
|
No. of gates
|
:
|
3
|
|
Size of gates
|
:
|
7.5m widex4.33m
high
|
|
15. Switchyard
|
|
Size & type
|
:
|
Surface, 400 KV
GIS Switch Gear
Double bus bars arrangement
|
|
16. Power Generation
|
|
Annual Energy generation in a 90% dependable year with 95% machine availability
|
:
|
1770 Gwh
|
|
Annual Plant Load Factor
|
:
|
49.04 %
|
|
17. Construction Programme (from the date of sanction)
|
|
Unit-1
|
:
|
55 months
|
|
Unit-2
|
:
|
56 months
|
|
Unit-3
|
:
|
57 months
|
|
Unit-4
|
:
|
58 months
|
|
Unit-5
|
:
|
59 months
|
|
Unit-6
|
:
|
60 months
|