Total Muck Generated till date is 2689517 cu.m out of which 946028 cu. m has been reutilized and the remaining 1742708* cu. m of muck has been dumped at 4 number designated dumping sites.
Time Period for completion: Till the completion of project
Status of Work as on dated(Physical): As above
Status of Work as on dated(Financial): As above
Remarks: 781 Cu.m of muck generated from DT/LT works has been dumped at re-handling point and shall be dumped in dumping yard in due course of time.