introduction back
The project is located in Purola Tehsil of District Utterkashi of Utrakhand State. The diversion site is proposed to be located in Purola Tehsil Distt. Uttar Kashi at latitude 31° 07’ 44” N and Longitude 78° 14’ 44” E at an latitude about 2000 Mtr.

PROJECT BENEFITS
Besides the social and economic upliftment of the people in its vicinity, the 51 MW Jakhol Sankri Hydro Electric Project will generate 219.99 MU of electrical energy in a 90% dependable year.

PROJECT COST
The cost of project is estimated as Rs. 358 crores. 

FUNDING PLAN
The Project shall be financed on 70 : 30 debt equity ratio.
The equity portion is to be shared between the Govt. of India (GOI) and Govt. of Himachal Pradesh (GOHP).

PRESENT STATUS
Implementation Agreement for the execution has been signed between Satluj Jal Vidyut Nigam Ltd. and Govt. of Uttarakhand on November 21, 2005. Presently, SJVN is in the process of update of Pre – Feasibility Report of Jakhol Sankri HE Project – 51MW. Preliminary Survey and Investigation Works has been commenced. Stage – I Clearance for MOEF has been obtained on February 27, 2006. EIA & EMP studies have been commenced w.e.f. July 12, 2006.

COMPLETION OF PROJECT
The 51 MW Jakhol Sankri HE Project, is expected to be commissioned  in 12th plan period after preparation of DPR, accordance of  Techno Economic Clearance and CCEA approval.
 

   