introduction back
The project is located between Nandkeshri Bridge and Simli Gad in Tehsil Tharali, Distt. Chamoli of Uttarakhand State between Latitude 30°02’35”- 30°07’30”N and Longitude79°34’17”- 79°25’00”E

Present Status of Devsari HE PROJECT
Implementation Agreement for the execution of 300 MW Devsari HEP has been signed between Satluj Jal Vidut Nigam Limited and Govt. of Uttarakhand on November 21, 2005. The storage Dam (Devsari HEP-300MW) has been converted into  Run of the River Scheme as Devsari HEP Stage-I 252 MW on 04/10/2007 and agreed by Govt. of Uttarakhand  between elevation of 1300m and 1045m on Pinder river. Preliminary Survey and Investigation works has been completed. Presently SJVNL is in the process of preparation of DPR based on Detailed Survey and Investigation Prior Environmental Clearance (PEC) has been accorded MOEF on April 25,2008.. EIA & EMP studies is in progress.

Completion of Devsari HE PROJECT
The 252 MW Devsari HE Project is expected to be commissioned in XIIth Plan.

PROJECT COST
On completion, the cost of project is estimated at Rs. 1351.13 Crores at October 2007 price level as per the FSR submitted to CEA.

Project Benefits
Besides the social and economic upliftment of the people in its vicinity, the 252 MW Devsari Hydro Electric Project will generate 902.71 GWh of electrical energy in a 90% dependable year.
 

   

 

R&R Activities
Environmental Issues
Welfare Activities
Devsari Hydro-electric Project Report