future plans back
Project Under Execution
 

Sr. No.

Project

Installed Capacity

State

1.

Rampur HEP

412 MW

Himachal Pradesh

Projects under Survey and Investigation and DPR Preparation

A. In the State of Himachal Pradesh

Sr. No.

Project

Installed Capacity

1.

Luhri HEP

775 MW

2.

Dhaulasidh

66 MW

B. In the State of Uttarakhand

Sr. No

Project

Installed Capacity

1.

Devsari HEP

252 MW

2.

Naitwar Mori HEP

60 MW

3.

Jakhol Sankri HEP

51 MW

C. In the State of Manipur

Sr. No

Project

Installed Capacity

1.

Tipaimukh HEP*

1500 MW

*This project will be developed by a joint venture company to be established in which SJVN have agreed to take a 26% equity inerest, with NHPC Limited and State of Manipur taking 69% and 5% equity interest respectively.

D. Projects Abroad

Sr. No

Project

Installed Capacity

Country

1.

Arun III

900 MW

Nepal

2.

Wangchu HEP

900 MW

Bhutan

3.

Kholongchu HEP

486 MW

Bhutan

Future Plans
The SJVN proposes to add 5000 MW additional capacity by 2014-15. This would require an additional investment of about Rs. 29,000 Crores which shall be met mainly from internal accruals and loans from domestic /multi literal funding agencies.

To achieve the target of setting up of additional 5000 MW SJVN is exploring the possibilities of taking up new projects in Himachal Pradesh, Arunachal Pradesh, Nepal and Bhutan.

   