Project Under Execution
|
Sr. No. |
Project |
Installed Capacity |
State |
|
1. |
Rampur HEP |
412 MW |
Himachal Pradesh |
Projects under Survey and Investigation and DPR
Preparation
A. In the State of Himachal Pradesh
|
Sr. No. |
Project |
Installed Capacity |
|
1. |
Luhri HEP |
775 MW |
|
2. |
Dhaulasidh |
66 MW |
B. In the State of Uttarakhand
|
Sr. No |
Project |
Installed Capacity |
|
1. |
Devsari HEP |
252 MW |
|
2. |
Naitwar Mori HEP |
60 MW |
|
3. |
Jakhol Sankri HEP |
51 MW |
C. In the State of Manipur
|
Sr. No |
Project |
Installed Capacity |
|
1. |
Tipaimukh HEP* |
1500 MW |
*This project will be developed by a joint venture company to be established in which SJVN have agreed to take a 26% equity inerest, with NHPC
Limited and State of Manipur taking 69% and 5% equity
interest respectively.
D. Projects Abroad
|
Sr. No |
Project |
Installed Capacity |
Country |
|
1. |
Arun III |
900 MW |
Nepal |
|
2. |
Wangchu HEP |
900 MW |
Bhutan |
|
3. |
Kholongchu HEP |
486 MW |
Bhutan |
Future Plans
The SJVN proposes to add 5000 MW additional capacity
by 2014-15. This would require an additional investment
of about Rs. 29,000 Crores which shall be met mainly
from internal accruals and loans from domestic /multi
literal funding agencies.
To achieve the target of setting up of additional
5000 MW SJVN is exploring the possibilities of taking up
new projects in Himachal Pradesh, Arunachal Pradesh,
Nepal and Bhutan.
|