GENERATION INCENTIVE SCHEME
INTRODUCTION:
The purpose of any Incentive Scheme is to motivate
the employees to give their best. A successful Incentive
Scheme should strike a balance between short range and
long range plant requirement and should achieve a good
blend of two in such a way as to optimize Generation on
sustained long range basis. Any Scheme which encourages
maximization of Generation only in the short term may be
self defeating as it leads to the irreparable damage to
the plant and machinery because of insufficient
motivation to employees for proper up-keep and
maintenance of plant. Incentive Scheme should take
foremost aspect of sustainability of plant into account.
Following objectives have been considered in
designing the Incentive Scheme.
- To keep the Generating Station in a readiness to
meet the Peaking Hours requirement of Grid by
maintaining the Capacity Index at an appropriate level.
This requires untiring efforts of whole team to keep the
Power Station properly maintained.
- To generate more revenue through Un-Scheduled
interchange within the tariff parameters as defined
under CERC Regulations.
- Reduction in absenteeism.
- To provide economic and quality power to
beneficiaries.
1. SHORT TITLE
The Scheme shall be called “SJVNL Power
Generation Incentive Scheme".
2. APPLICABILITY
2.1 The Scheme covers all regular employees including
deputationists directly or indirectly engaged in
Generation of Electricity. The Scheme will not be
applicable to:-
- Any Apprentice including Apprentices under
Apprentices Act.
- Casual employees.
2.2 This scheme shall be restricted to the sanctioned
manpower for O&M of NJHEP and Corporate Staff.
3. DEFINITION
Unless the context otherwise requires for the purpose
of this scheme:-
-
CAPACITY INDEX: means Capacity Index as defined
under CERC Regulations.
-
CUMULATIVE CAPACITY INDEX: means Cumulative
Capacity Index as defined under CERC Regulation and as
declared by NRLDC/NREB at the end of Financial Quarter.
-
FINANCIAL YEAR: means financial year ending on 31st
March.
-
FINANCIAL QUARTER: means financial quarter ending
on 30th June, 30th September, 31st December & 31st
March.
-
NORMATIVE CAPCITY INDEX: means Normative Capacity
Index as declared in CERC Regulations for recovery of
full Capacity Charges.
-
UN-SCHEDULED INTER-CHANGE:
means as defined in
CERC Regulations.
4. FACTORS FOR INCENTIVE PAYMENT
Generation Incentive will be linked with the
Cumulative Capacity Index and Unscheduled Interchanges
achieved/earned at the end of each financial quarter.
5. GENERATION INCENTIVE BASED ON CAPACITY INDEX
5.1 The Generation Incentive based on Capacity Index
will have quarterly and annual components of payment
linked with the corresponding Capacity Index levels.
There will be graded increase in rate of Incentive for
increase in Capacity Index over and above Normative
Capacity Index. The Performance Payment Matrix is given
below:
|
Cumulative Capacity Index at the end of
Financial Quarter |
Generation Incentive Payable. |
|
Operation Staff |
Maintenance Staff |
|
% of Basic Pay |
% of Basic Pay |
|
85 |
2 |
2 |
|
86 |
3 |
5 |
|
87 |
4 |
7 |
|
88 |
5 |
10 |
|
89 |
6 |
11 |
|
90 |
7 |
12 |
|
91 |
8 |
13 |
|
92 |
9 |
14 |
|
93-100 |
10 |
15 |
6. GENERATION INCENTIVE BASED ON UNSCHEDULED
INTERCHANGES.
The Generation Incentive linked with Un-Scheduled
Inter-Change will be paid quarterly on the basis of
achievement of target set by the Commercial and System
Operation Department with the approval of CMD as under:
|
Level of achievement of targets during the
quarter |
Quarterly percentage of basic to be paid |
|
Operation staff |
Maintenance staff |
|
100% -114% |
10% |
7% |
|
115%-129% |
11% |
8% |
|
130%-144% |
12% |
9% |
|
145%-159% |
13% |
10% |
|
160%-174% |
14% |
10% |
|
175% or more |
15% |
10% |
6.2 Incentive payable under above Para is independent
and not linked with Capacity Index and shall be
determined separately by considering restriction
indicated at Para 8.8.
7. CLASSIFICATION OF EMPLOYEES.
7.1 For the purpose of payment of incentive,
employees will be classified into the following groups:-
Group `A': Eligible employees directly and
exclusively engaged in Operation & Maintenance of
the commissioned units as specified in Clause 8.6
(Column-I).
Group `B': All employees not covered under Group `A'.
This group includes employees as specified in Clause 8.6
(Column- II).
Group ‘C’: All employees posted at Corporate
Office Shimla/Parwanoo/Delhi.
8. QUANTUM OF INCENTIVE
8.1 In no case the Generation Incentive on account of
Capacity Index and Un-scheduled Inter-change together
shall be more than 25% of basic pay of Group A employees
and 18.75% of basic pay for Group-B employees.
8.2 Generation Incentive shall not be paid more than
15% on account of UI Charges and 10% on account of CI
Charges to Operation Staff.
8.3 Generation Incentive shall not be paid more than
10% on account of UI Charges and 15% on account of CI
Charges to Maintenance Staff.
8.4. Other staff at Project site including
Ministerial and Drivers deployed in O&M will be
entitled for 75% of Generation Incentive payable under
Clause 8.3.
8.5 The payment of incentive on account of Capacity
Index as well as Unscheduled Interchange will be paid to
employees as under:-
|
Direct Category "Group-A" |
Indirect Category "Group-B. |
“Group – C” |
|
100% of Incentive payable |
75% of Incentive payable to Maintenance Staff. |
50% of Incentive payable to Group “B”. |
8.6 Deptt/areas under each group will be as under:-
| Column-I |
Column -II |
| Deptts/Areas under Direct Category (Group-A) |
Deptts/Area under Indirect Category Group-B |
| Operation Staff – employees deployed in
Operation of Power and Dam excluding Ministerial
Staff and Drivers.
Maintenance Staff:- employees deployed
maintenance of Power House and Dam including Power
Supply System Maintenance but excluding
Ministerial Staff and Drivers. |
Other Departments at Power Station Site
including Ministerial Staff and Drivers deployed
in O&M. |
Note:- (i) Department/Areas not covered above will be
classified by Corporate HR Division with the approval of
CMD/D(P).
(ii) The department/area of posting will be the basis
for category/group for the purpose of incentive. The
additional area/function assigned, if any, will not
change incentive category/group of an individual
employee.
8.7 The employees posted at Corporate Centre Shimla/
Parwanoo/ Delhi shall be entitled for 50% of Generation
Incentive payable to Group “B” employees and
weightage average of construction incentive if
applicable for other projects.
8.8 Only 50% of Generation Incentive payable during
the quarter shall be paid quarterly. Remaining 50% will
be paid at the end of financial year subject to
condition that Cumulative Capacity Index at the end of
financial year is normative or more.
9. OTHER GENERAL CONDITIONS
9.1 The employees will be entitled to incentive on
pro-rata basis for actual period of attendance. All
types of leave except leave without pay, Study Leave and
Extra Ordinary Leave will be counted towards actual
attendance. The period of training in India for duration
of not more than 15 days will be treated as actual
attendance. Foreign Training for the period not more
than 7 days will be treated as actual attendance.
9.2 The amount of Incentive earnings will neither be
termed as pay nor allowance, nor wages. Accordingly,
this amount would not count for any service benefits
i.e. computation of House Rent Allowance, Compensatory
Allowance, encashment of leave, pay fixation, Provident
Fund, Pension or Gratuity etc.
9.3 Employees may be transferred from one
department/division to another. In such cases their
entitlement for incentive will be determined as per the
entitlement of the department/division in which they
have actually worked.
9.4 Capacity Index and Un-scheduled Inter-change
declared by NRLDC/NREB will be taken into account for
determining the Generation Incentive to be certified by
Commercial & System Operation Deptt.
9.5 The management reserves the right to
review/modify the scheme at its own discretion from time
to time keeping in view efficiency of the plant being
increased/ improved through installation of more or
better equipment or by improving the mechanical
process/technology/methods/systems/procedures and other
extraneous factor.
9.6 .1 CMD/D (P) will be Competent Authority to
interpret any doubt under this scheme and their decision
shall be final.
|