With the expertise gained over the years with regard to
planning, design, construction management, contracts
management as well as in other disciplines and also the
experience of rectifying problems, particularly those
encountered during the construction of such unique and
large underground works, a Consultancy Division, headed
by a General Manager, has been established which
utilizes the expertise gained in an integrated manner
from concept to commissioning of the ongoing and future
projects of sister organizations, both in public and
private sectors. Any consultancy work undertaken by
SJVNL is completed by a team of experts of the
following departments;
I. Civil Designs
- Dam, Intake and Desilting
- Power House
- Water Conductor System
- Infrastructure Design / Consultancy Deptt.
- Corporate Geology Deptt.
- Hydro- Mechanical Designs (M&G)
- Electro-Mechanical Designs (ECD)
SJVNL’S SERVICE EXPERIENCE INCLUDES
-
Complete designs of
Nathpa Jhakri Project covering civil works like
concrete gravity dam, Power intakes, desilting
arrangements, Water conductor system (HRT etc.)
Surge shaft, Valve chamber, pressure shafts, Power
house complex (underground), drop shaft, trench weir
and other allied works including protection and
river training works.
-
Specifications for
hydro mechanical works like Gates, Valves and hoists
etc.
-
Specifications for
Electro mechanical works like generators, turbines,
transformers, butterfly valves, SF6 equipments,
Control equipments and auxiliary equipments.
-
Contract documents for
civil, hydro-mechanical and electro- mechanical
works.
-
Specific and typical
technical issues/problems encountered during
construction of the various components of the
project.
-
Efficient Power house
operation being achieved through silt management by
adopting short & long term measures, on the basis of
hydraulic model studies carried out at CWPRS, Pune
by;
- Providing blank panels in the trash rack.
- Reservoir operation i.e. periodical flushing of
reservoir.
- Providing a diversion tunnel at Nathpa dam is under
process.
- Catchment area treatment.
INNOVATIONS AND IN-HOUSE R & D ACTIVITIES
a) During Construction
-
200 T capacity cable
anchors for stabilization of hill slopes in dam and
intake area, the largest capacity provided so far in
India.
-
Successfully tackling
of hot water with a maximum temperature of 66 degree
C encountered in HRT.
-
DRESS Methodology (Drainage Reinforcement –
Excavation - Support Solution) to tackle extremely poor
ground condition.
-
Fabrication of steel liners of 8.5 m dia inside the
tunnel cavern.
b) During Operation and Maintenances
-
The underwater parts of turbine have been hard
coated with Tungsten Carbide based powder with HVOF
technique.
-
Indigenization of major turbine components like wear
rings, guide vane bushings etc. have been done
|